How to distribute NRC based on WO


1. In order to distribute NRC based on WO, go to the submodule "WO". /images/how_to/Line Maintenance/How_to_create_WO_1.png

2. Then go to the tab "Distribution". /images/how_to/Line Maintenance/How_to_distribute_WO_NRC_9.png

3. Select the WO number to be distributed from the list in the window "Line Work Order List". Double click on the corresponding line.

Note: If necessary, use searching filters, in the fields: "AC Reg.", "WO".

/images/how_to/Line Maintenance/How_to_distribute_WO_NRC_1.png

4. Then go to the tab "NRC". /images/how_to/Line Maintenance/How_to_distribute_WO_NRC_2.png

5. Select the NRC number required for distribution from the list in the window "NRC List". Double click on the corresponding line.

Note: If necessary, use searching filters, in the fields: "Filters".

/images/how_to/Line Maintenance/How_to_distribute_WO_NRC_3.png

6. Make sure that the required NRC for distribution has moved to the right window "Selected NRC". /images/how_to/Line Maintenance/How_to_distribute_WO_NRC_4.png

7. Select the ID of staff who will be assigned to perform tasks from dropdown list.

Note: The time and date fields are filled automatically there is a current time when you work with the editor.

/images/how_to/Line Maintenance/How_to_distribute_WO_NRC_5.png

8. Click the diskette symbol button to save the distribution. /images/how_to/Line Maintenance/How_to_distribute_WO_NRC_6.png

9. Click on the button "Yes", to confirm the distribution of NRC to perform. /images/how_to/Line Maintenance/How_to_distribute_WO_NRC_7.png

10. Make sure that the task has moved from the "open" status to the "scheduled" status. To check it, set the filter "P". /images/how_to/Line Maintenance/How_to_distribute_WO_NRC_8.png